Menu

Thalia Blueprint


Locations

Inventory: Blueprint > Frigate Blueprint


Manufacturing
Manufacturing Time
1 day, 9 hours, 20 minutes
Skilled Time (Industry 5 + Adv. Indu. 5)
22 hours, 40 minutes
Produces
Thalia

 
Requirements
Materials ME 0% ME-1% ME-2% ME-3% ME-4% ME-5% ME-6% ME-7% ME-8% ME-9% ME-10%
Construction Blocks 25 25 25 25 24 24 24 24 23 23 23
Crystalline Carbonide Armor Plate 375 372 368 364 360 357 353 349 345 342 338
Fusion Reactor Unit 4 4 4 4 4 4 4 4 4 4 4
Ion Thruster 25 25 25 25 24 24 24 24 23 23 23
Magnetometric Sensor Cluster 60 60 59 59 58 57 57 56 56 55 54
Morphite 15 15 15 15 15 15 15 14 14 14 14
Navitas 1 1 1 1 1 1 1 1 1 1 1
Oscillator Capacitor Unit 125 124 123 122 120 119 118 117 115 114 113
Photon Microprocessor 125 124 123 122 120 119 118 117 115 114 113
Pulse Shield Emitter 15 15 15 15 15 15 15 14 14 14 14
R.A.M.- Starship Tech 6 6 6 6 6 6 6 6 6 6 6
Skills
Advanced Small Ship Construction 1
Gallente Starship Engineering 1
Industry 5
Nanite Engineering 1

Material Efficiency
Research Time
11 hours, 40 minutes
Skilled Time (Metallurgy 5 + Adv. Indu. 5)
7 hours, 26 minutes, 15 seconds

 
Research Requirements
Materials Amount
Consumer Electronics 6
R.Db - Roden Shipyards 2
Reports 16
Skills
Gallente Starship Engineering 1
Metallurgy 5
Nanite Engineering 1

 
ME & TE Research Times
Level 1
7 hours, 26 minutes, 15 seconds
Level 2
17 hours, 42 minutes, 30 seconds
Level 3
1 day, 18 hours, 8 minutes, 45 seconds
Level 4
4 days, 4 hours, 9 minutes, 30 seconds
Level 5
9 days, 22 hours
Level 6
23 days, 14 hours, 40 minutes
Level 7
1 month, 26 days, 1 hour, 50 minutes
Level 8
4 months, 13 days, 13 hours, 33 minutes, 45 seconds
Level 9
10 months, 17 days, 20 hours, 45 minutes
Level 10
2 years, 1 month, 5 days, 13 hours, 20 minutes

Time Efficiency
Research Time
11 hours, 40 minutes
Skilled Time (Research 5 + Adv. Indu. 5)
7 hours, 26 minutes, 15 seconds

 
Research Requirements
Materials Amount
Consumer Electronics 6
R.Db - Roden Shipyards 2
Reports 12
Skills
Gallente Starship Engineering 1
Nanite Engineering 1
Research 5

 
Copy
Copying Time (per single-run copy)
1 day, 2 hours, 40 minutes
Skilled Time (Science 5 + Adv. Indu. 5)
17 hours
Max. Runs Per Copy
1

 
Copying Requirements
Materials Amount
Data Sheets 80
R.Db - Roden Shipyards 4
Skills
Gallente Starship Engineering 1
Nanite Engineering 1

 


Database: YC119.1 (2017-01-14)

User: Register | Login