Menu

Standup L-Set Point Defense Battery Control II Blueprint

Baseprice: 500,000,000 ISK

Locations

Inventory: Blueprint > Structure Rig Blueprint


Manufacturing
Manufacturing Time
12 hours, 30 minutes
Skilled Time (Industry 5 + Adv. Indu. 5)
8 hours, 30 minutes
Produces
Standup L-Set Point Defense Battery Control II

 
Requirements
Materials ME 0% ME-1% ME-2% ME-3% ME-4% ME-5% ME-6% ME-7% ME-8% ME-9% ME-10%
Artificial Neural Network 11,250 11,138 11,025 10,913 10,800 10,688 10,575 10,463 10,350 10,238 10,125
Conductive Thermoplastic 1,500 1,485 1,470 1,455 1,440 1,425 1,410 1,395 1,380 1,365 1,350
Drone Transceiver 11,250 11,138 11,025 10,913 10,800 10,688 10,575 10,463 10,350 10,238 10,125
Enhanced Ward Console 60 60 59 59 58 57 57 56 56 55 54
Impetus Console 1,500 1,485 1,470 1,455 1,440 1,425 1,410 1,395 1,380 1,365 1,350
Intact Shield Emitter 60 60 59 59 58 57 57 56 56 55 54
Lorentz Fluid 1,500 1,485 1,470 1,455 1,440 1,425 1,410 1,395 1,380 1,365 1,350
Power Conduit 1,500 1,485 1,470 1,455 1,440 1,425 1,410 1,395 1,380 1,365 1,350
R.A.M.- Robotics 1 1 1 1 1 1 1 1 1 1 1
Single-crystal Superalloy I-beam 60 60 59 59 58 57 57 56 56 55 54
Telemetry Processor 11,250 11,138 11,025 10,913 10,800 10,688 10,575 10,463 10,350 10,238 10,125
Skills
Electronic Engineering 1
Graviton Physics 1
Industry 5

Material Efficiency
Research Time
4 hours, 22 minutes, 30 seconds
Skilled Time (Metallurgy 5 + Adv. Indu. 5)
2 hours, 47 minutes, 21 seconds

 
Research Requirements
Materials Amount
Consumer Electronics 4
R.Db - CreoDron 1
Reports 8
Skills
Electronic Engineering 1
Graviton Physics 1
Metallurgy 5

 
ME & TE Research Times
Level 1
2 hours, 47 minutes, 21 seconds
Level 2
6 hours, 38 minutes, 26 seconds
Level 3
15 hours, 48 minutes, 17 seconds
Level 4
1 day, 13 hours, 33 minutes, 34 seconds
Level 5
3 days, 17 hours, 15 minutes
Level 6
8 days, 20 hours, 30 minutes
Level 7
21 days, 41 minutes, 15 seconds
Level 8
1 month, 20 days, 2 hours, 5 minutes, 9 seconds
Level 9
3 months, 29 days, 4 hours, 46 minutes, 53 seconds
Level 10
9 months, 13 days, 8 hours

Time Efficiency
Research Time
4 hours, 22 minutes, 30 seconds
Skilled Time (Research 5 + Adv. Indu. 5)
2 hours, 47 minutes, 21 seconds

 
Research Requirements
Materials Amount
Consumer Electronics 4
R.Db - CreoDron 1
Reports 8
Skills
Electronic Engineering 1
Graviton Physics 1
Research 5

 
Copy
Copying Time (per single-run copy)
10 hours
Skilled Time (Science 5 + Adv. Indu. 5)
6 hours, 22 minutes, 30 seconds
Max. Runs Per Copy
1

 
Copying Requirements
Materials Amount
Data Sheets 10
R.Db - CreoDron 1
Skills
Electronic Engineering 1
Graviton Physics 1

 


Database: YC119.1 (2017-01-14)

User: Register | Login