Menu

Medium Mercoxit Mining Crystal Optimization I

Market Price: 605,601 ISK

Locations

Market: Market > Ship and Module Modifications > Rigs > Resource Processing Rigs > Medium Resource Processing Rigs
Inventory: Module > Rig Resource Processing


Image Description
Medium Mercoxit Mining Crystal Optimization I
This ship modification is designed to increase the yield modifier of those modules using Mercoxit mining crystals.


Attributes
Mining Amount Bonus:
16 %
 
Fitting
Rig Size:
Medium
Calibration Cost:
250
 
Other
Tech Level:
1
Meta Level:
0
Hitpoints:
40 HP
Volume:
10 m3
Mass:
200 kg


Manufacturing

Blueprint
Blueprint: Medium Mercoxit Mining Crystal Optimization I Blueprint
Base Price: 750,000 ISK
Manufacturing Time: 50 minutes
- Batch Size: 1
ME Research Time: 17 minutes, 30 seconds
PE Research Time: 17 minutes, 30 seconds
Copying Time: 40 minutes
- Max. Runs: 60
 

Recycling Output

Quantity Item Market Price
13  Conductive Polymer 196,632
Defective Current Pump 152,593
18  Fried Interface Circuit 59,353
22  Tripped Power Circuit 119,399
= 527,977


Other Attributes

Other
Attribute Name Display Name Value
radius   100


Database: Invasion 2 (2019-11-26)

User: Register | Login