Menu

Capital Anti-Kinetic Screen Reinforcer I Blueprint

Baseprice: 125,000 ISK
Not Published

Locations

Inventory: Blueprint > Rig Blueprint


Attributes

General Information
Produces
1 x Capital Anti-Kinetic Screen Reinforcer I
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
10 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 9 minutes, 36 seconds
Level 2: 9 minutes, 12 seconds
Level 3: 8 minutes, 48 seconds
Level 4: 8 minutes, 24 seconds
Level 5: 8 minutes
Waste Factor
0.10
Researching
Research Material Time
3 hours, 20 minutes
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Research Productivity Time
3 hours, 20 minutes
Research Productivity Time (With Research Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Max. Production Runs On Copies
1.000
Research Copy Time - Max Copies
6 hours, 40 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 6 hours, 20 minutes
Level 2: 6 hours
Level 3: 5 hours, 40 minutes
Level 4: 5 hours, 20 minutes
Level 5: 5 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 22 seconds
Level 2: 21 seconds
Level 3: 20 seconds
Level 4: 19 seconds
Level 5: 18 seconds
Invention
Invention Time
2 hours, 30 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
120
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Charred Micro Circuit 325 358 374 390 406 423 439
Fried Interface Circuit 375 413 431 450 469 488 506
Malfunctioning Shield Emitter 200 220 230 240 250 260 270
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
75
= 10 days, 10 hours
'Optimal' Material Level
0
= 0 seconds
Production Efficiency
Perfect Productivity Level
240
= 1 month, 3 days, 8 hours
= Manufacturing time (PL 5): 8 minutes, 20 seconds
= Manufacturing time (PL 10): 8 minutes, 11 seconds
= Manufacturing time (PL 20): 8 minutes, 6 seconds
= Manufacturing time (perfect PL): 8 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 1000 Item Cost Time For Research


Database: Inferno 1.1.5 (392804)

User: Register | Login