Menu

Capital Signal Disruption Amplifier II Blueprint

Baseprice: 50,000,000 ISK

Locations

Inventory: Blueprint > Rig Blueprint


Attributes

General Information
Produces
1 x Capital Signal Disruption Amplifier II
Tech Level
2
Volume
0.0100 m3
Manufacturing
Manufacturing Time
16 hours, 40 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 16 hours
Level 2: 15 hours, 20 minutes
Level 3: 14 hours, 40 minutes
Level 4: 14 hours
Level 5: 13 hours, 20 minutes
Waste Factor
0.10
Researching
Research Material Time
13 days, 21 hours, 20 minutes
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 13 days, 4 hours, 40 minutes
Level 2: 12 days, 12 hours
Level 3: 11 days, 19 hours, 20 minutes
Level 4: 11 days, 2 hours, 40 minutes
Level 5: 10 days, 10 hours
Research Productivity Time
13 days, 21 hours, 20 minutes
Research Productivity Time (With Research Skill Bonus)
Level 1: 13 days, 4 hours, 40 minutes
Level 2: 12 days, 12 hours
Level 3: 11 days, 19 hours, 20 minutes
Level 4: 11 days, 2 hours, 40 minutes
Level 5: 10 days, 10 hours
Max. Production Runs On Copies
10
Research Copy Time - Max Copies
27 days, 18 hours, 40 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 26 days, 9 hours, 20 minutes
Level 2: 25 days
Level 3: 23 days, 14 hours, 40 minutes
Level 4: 22 days, 5 hours, 20 minutes
Level 5: 20 days, 20 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 2 days, 15 hours, 20 minutes
Level 2: 2 days, 12 hours
Level 3: 2 days, 8 hours, 40 minutes
Level 4: 2 days, 5 hours, 20 minutes
Level 5: 2 days, 2 hours
Invention
Invention Time
10 days, 10 hours
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
12000
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0.4
 

Bill Of Materials

Manufacturing
Skills
Industry 5
Jury Rigging 4
Electromagnetic Physics 4
Electronic Engineering 4
Materials - Partially Consumed Usage
R.A.M.- Electronics 20%
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Artificial Neural Network 70 77 81 84 88 91 95
Conductive Thermoplastic 30 33 35 36 38 39 41
Power Circuit 80 88 92 96 100 104 108
Time Efficiency Research
Skills
Jury Rigging 4
Research 5
Material Research
Skills
Jury Rigging 4
Metallurgy 5
Copying
Materials - Consumed Amount
Data Sheets 50
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
16
= 7 months, 12 days, 5 hours, 20 minutes
'Optimal' Material Level
0
= 0 seconds
Production Efficiency
Perfect Productivity Level
24.000
= 925 years, 11 months, 3 days, 8 hours
= Manufacturing time (PL 5): 13 hours, 53 minutes, 20 seconds
= Manufacturing time (PL 10): 13 hours, 38 minutes, 11 seconds
= Manufacturing time (PL 20): 13 hours, 29 minutes, 31 seconds
= Manufacturing time (perfect PL): 13 hours, 20 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 10 Item Cost Time For Research


Database: Odyssey 1.0.2 (550422)

User: Register | Login