Menu

Capital Low Friction Nozzle Joints II Blueprint

Baseprice: 125,000 ISK
Not Published

Locations

Inventory: Blueprint > Rig Blueprint


Image
Capital Low Friction Nozzle Joints II Blueprint


Attributes

General Information
Produces
1 x Capital Low Friction Nozzle Joints II
Tech Level
2
Volume
0.0100 m3
Manufacturing
Manufacturing Time
16 hours, 40 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 16 hours
Level 2: 15 hours, 20 minutes
Level 3: 14 hours, 40 minutes
Level 4: 14 hours
Level 5: 13 hours, 20 minutes
Waste Factor
0.10
Researching
Research Material Time
2 days, 18 hours, 40 minutes
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 2 days, 15 hours, 20 minutes
Level 2: 2 days, 12 hours
Level 3: 2 days, 8 hours, 40 minutes
Level 4: 2 days, 5 hours, 20 minutes
Level 5: 2 days, 2 hours
Research Productivity Time
4 days, 4 hours
Research Productivity Time (With Research Skill Bonus)
Level 1: 3 days, 23 hours
Level 2: 3 days, 18 hours
Level 3: 3 days, 13 hours
Level 4: 3 days, 8 hours
Level 5: 3 days, 3 hours
Max. Production Runs On Copies
1.000
Research Copy Time - Max Copies
13 days, 21 hours, 20 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 13 days, 4 hours, 40 minutes
Level 2: 12 days, 12 hours
Level 3: 11 days, 19 hours, 20 minutes
Level 4: 11 days, 2 hours, 40 minutes
Level 5: 10 days, 10 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 19 minutes
Level 2: 18 minutes
Level 3: 17 minutes
Level 4: 16 minutes
Level 5: 15 minutes
Invention
Invention Time
10 days, 10 hours
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
12000
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Impetus Console 30 33 35 36 38 39 41
Logic Circuit 90 99 104 108 113 117 122
Micro Circuit 80 88 92 96 100 104 108
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
18
= 1 month, 20 days
'Optimal' Material Level
0
= 0 seconds
Production Efficiency
Perfect Productivity Level
24.000
= 277 years, 9 months, 10 days
= Manufacturing time (PL 5): 13 hours, 53 minutes, 20 seconds
= Manufacturing time (PL 10): 13 hours, 38 minutes, 11 seconds
= Manufacturing time (PL 20): 13 hours, 29 minutes, 31 seconds
= Manufacturing time (perfect PL): 13 hours, 20 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 1000 Item Cost Time For Research


Database: Retribution 1.2.2 (534348)

User: Register | Login