Menu

ORE Strip Miner

Market Price: 209,698,700 ISK

Locations

Market: Market > Ship Equipment > Harvest Equipment > Strip Miners
Inventory: Module > Strip Miner


Image Description
ORE Strip Miner
A bulk ore extractor designed for use on Mining Barges and Exhumers.


Attributes
Mining Amount:
700 m3
Mining Rate:
3.89 m3/s
Optimal Range:
18,750 m
 
Fitting
CPU:
50 tf
Powergrid:
10 MW
Activation Cost:
90 GJ
Duration:
180.0 sec
Running Cost:
0.50 GJ/s
Slot:
Requires a high power slot
Can be fitted to group:
Mining Barge
Exhumer
 
Required Skills
Mining 4
 
Other
Tech Level:
1
Meta Level:
6
Hitpoints:
40 HP
Volume:
5 m3


Variations

Group Name Mining Amount Range Duration Activation Cost CPU Powergrid
Tech I
Strip Miner I 675 m3 15,000 m 180.0 sec 90 GJ 60 tf 10 MW
Tech II
Modulated Deep Core Strip Miner II 313 m3 15,000 m 180.0 sec 90 GJ 60 tf 12 MW
Tech II
Modulated Strip Miner II 450 m3 15,000 m 180.0 sec 120 GJ 60 tf 12 MW
Faction
ORE Strip Miner 700 m3 18,750 m 180.0 sec 90 GJ 50 tf 10 MW


Manufacturing

Blueprint (Not Published)
Blueprint: ORE Strip Miner Blueprint
Base Price: 16,130,080 ISK
Manufacturing Time: 35 minutes
- Batch Size: 1
ME Research Time: 12 minutes, 15 seconds
PE Research Time: 12 minutes, 15 seconds
Copying Time: 28 minutes
- Max. Runs: 80
 

Recycling Output

Quantity Item Market Price
176  Megacyte 63,188
7,806  Mexallon 313,177
744  Nocxium 174,461
30,613  Pyerite 145,106
98,658  Tritanium 526,834
= 1,222,764


Offered in LP Stores

Offered Cost Where
1x ORE Strip Miner
45,000 LP + 30,000,000 ISK
1x Strip Miner I
Outer Ring Excavations
Outer Ring Development
Outer Ring Prospecting
ORE Technologies
+ 5 more


Other Attributes

Other
Attribute Name Display Name Value
radius   25
targetGroup   11


Database: Invasion 2 (2019-11-26)

User: Register | Login