Menu

ORE Strip Miner

Market Price: 186,038,177 ISK

Locations

Market: Market > Ship Equipment > Harvest Equipment > Strip Miners
Inventory: Module > Strip Miner


Image Description
ORE Strip Miner
A bulk ore extractor designed for use on Mining Barges and Exhumers.


Attributes
Can be fitted to:
Mining Barge
Can be fitted to:
Exhumer
Volume:
5 m3
Mining amount:
700 m3
Optimal Range:
17,000 m
 
Fitting
CPU:
50 tf
Powergrid:
10 MW
Activation Cost:
90 GJ
Duration:
180.0 sec
Running Cost:
0.50 GJ/s
Slot:
Requires a high power slot
 
Required Skills
Mining 4
 
Other
Tech Level:
1
Meta Level:
6
Hitpoints:
40 HP
Volume:
5.00 m3


Other Attributes

Other
Attribute Name Display Name Value
radius   25
targetGroup   11


Variations

Group Name Mining Amount Range Duration Activation Cost
Tech I
Strip Miner I 675 m3 15,000 m 180.0 sec 90 GJ
Tech II
Modulated Deep Core Strip Miner II 313 m3 15,000 m 180.0 sec 90 GJ
Tech II
Modulated Strip Miner II 450 m3 15,000 m 180.0 sec 120 GJ
Faction
ORE Strip Miner 700 m3 17,000 m 180.0 sec 90 GJ


Manufacturing

Blueprint (Not Published)
Blueprint: ORE Strip Miner Blueprint
Market Price: 16,130,080 ISK
Manufacturing Time: 35 minutes
ME Research Time: 12 minutes, 15 seconds
PE Research Time: 12 minutes, 15 seconds
Copying Time: 28 minutes
Max. Runs When Copied: 80
Batch Size: 1


Recycling Output

Quantity Item
176
Megacyte
7,806
Mexallon
744
Nocxium
30,613
Pyerite
98,658
Tritanium


Offered in LP Stores

Offered Cost
1x ORE Strip Miner
45,000 LP + 30,000,000 ISK
1x Strip Miner I


Database: YC119.1 (2017-01-14)

User: Register | Login