Menu

Khanid Navy Ballistic Control System Blueprint


Locations

Inventory: Blueprint > Ballistic Control System Blueprint


Image
Khanid Navy Ballistic Control System Blueprint


Attributes

General Information
Produces
1 x Khanid Navy Ballistic Control System
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
10 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 9 minutes, 36 seconds
Level 2: 9 minutes, 12 seconds
Level 3: 8 minutes, 48 seconds
Level 4: 8 minutes, 24 seconds
Level 5: 8 minutes
Waste Factor
0.10
Researching
Research Material Time
3 hours, 20 minutes
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Research Productivity Time
3 hours, 20 minutes
Research Productivity Time (With Research Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Max. Production Runs On Copies
1.000
Research Copy Time - Max Copies
6 hours, 40 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 6 hours, 20 minutes
Level 2: 6 hours
Level 3: 5 hours, 40 minutes
Level 4: 5 hours, 20 minutes
Level 5: 5 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 22 seconds
Level 2: 21 seconds
Level 3: 20 seconds
Level 4: 19 seconds
Level 5: 18 seconds
Invention
Invention Time
1 day, 9 hours, 20 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
120
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 5
Electronic Engineering 1
Mechanical Engineering 1
Materials - Partially Consumed Usage
R.A.M.- Electronics 20%
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Ballistic Control System I 1 1 1 1 1 1 1
Mechanical Parts 5 6 6 6 6 7 7
Miniature Electronics 2 2 2 2 3 3 3
Guidance Systems 5 6 6 6 6 7 7
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
1
= 3 hours, 20 minutes
'Optimal' Material Level
1
= 3 hours, 20 minutes
Production Efficiency
Perfect Productivity Level
240
= 1 month, 3 days, 8 hours
= Manufacturing time (PL 5): 8 minutes, 20 seconds
= Manufacturing time (PL 10): 8 minutes, 11 seconds
= Manufacturing time (PL 20): 8 minutes, 6 seconds
= Manufacturing time (perfect PL): 8 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 1000 Item Cost Time For Research
0 56.600,00 0,00 56.600,00 0 seconds
1 55.620,00 20,00 55.640,00 3 hours, 20 minutes


Database: Inferno 1.1.5 (392804)

User: Register | Login