Menu

Domination Medium Artillery Battery Blueprint


Locations

Inventory: Blueprint > Structures - Projectile Battery Blueprints


Image
Domination Medium Artillery Battery Blueprint


Attributes

General Information
Produces
1 x Domination Medium Artillery Battery
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
2 hours, 15 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 2 hours, 9 minutes, 36 seconds
Level 2: 2 hours, 4 minutes, 12 seconds
Level 3: 1 hour, 58 minutes, 48 seconds
Level 4: 1 hour, 53 minutes, 24 seconds
Level 5: 1 hour, 48 minutes
Waste Factor
0.10
Researching
Research Material Time
1 day, 21 hours
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 1 day, 18 hours, 45 minutes
Level 2: 1 day, 16 hours, 30 minutes
Level 3: 1 day, 14 hours, 15 minutes
Level 4: 1 day, 12 hours
Level 5: 1 day, 9 hours, 45 minutes
Research Productivity Time
1 day, 21 hours
Research Productivity Time (With Research Skill Bonus)
Level 1: 1 day, 18 hours, 45 minutes
Level 2: 1 day, 16 hours, 30 minutes
Level 3: 1 day, 14 hours, 15 minutes
Level 4: 1 day, 12 hours
Level 5: 1 day, 9 hours, 45 minutes
Max. Production Runs On Copies
3
Research Copy Time - Max Copies
3 days, 18 hours
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 3 days, 13 hours, 30 minutes
Level 2: 3 days, 9 hours
Level 3: 3 days, 4 hours, 30 minutes
Level 4: 3 days
Level 5: 2 days, 19 hours, 30 minutes
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 1 day, 4 hours, 30 minutes
Level 2: 1 day, 3 hours
Level 3: 1 day, 1 hour, 30 minutes
Level 4: 1 day
Level 5: 22 hours, 30 minutes
Invention
Invention Time
1 day, 9 hours, 45 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
1620
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 1
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Isogen 1.000 1.100 1.150 1.200 1.250 1.300 1.350
Megacyte 5 6 6 6 6 7 7
Medium Artillery Battery 1 1 1 1 1 1 1
Isogen 1 1 1 1 1 1 1
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
200
= 1 year, 15 days
'Optimal' Material Level
0
= 0 seconds
Production Efficiency
Perfect Productivity Level
3.240
= 16 years, 10 months, 15 days
= Manufacturing time (PL 5): 1 hour, 52 minutes, 30 seconds
= Manufacturing time (PL 10): 1 hour, 50 minutes, 27 seconds
= Manufacturing time (PL 20): 1 hour, 49 minutes, 17 seconds
= Manufacturing time (perfect PL): 1 hour, 48 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 3 Item Cost Time For Research
0 2.690.080,00 0,00 2.690.080,00 0 seconds
1 2.675.488,00 90.000,00 2.765.488,00 1 day, 21 hours
2 2.673.312,00 180.000,00 2.853.312,00 3 days, 18 hours
3 2.672.288,00 270.000,00 2.942.288,00 5 days, 15 hours
4 2.671.648,00 360.000,00 3.031.648,00 7 days, 12 hours
5 2.671.264,00 450.000,00 3.121.264,00 9 days, 9 hours
6 2.670.880,00 540.000,00 3.210.880,00 11 days, 6 hours
7 2.670.752,00 630.000,00 3.300.752,00 13 days, 3 hours
8 2.670.496,00 720.000,00 3.390.496,00 15 days
9 2.670.368,00 810.000,00 3.480.368,00 16 days, 21 hours
10 2.670.240,00 900.000,00 3.570.240,00 18 days, 18 hours
11 2.670.112,00 990.000,00 3.660.112,00 20 days, 15 hours
13 2.669.984,00 1.170.000,00 3.839.984,00 24 days, 9 hours
15 2.669.856,00 1.350.000,00 4.019.856,00 28 days, 3 hours
18 2.669.728,00 1.620.000,00 4.289.728,00 1 month, 3 days, 18 hours
22 2.669.600,00 1.980.000,00 4.649.600,00 1 month, 11 days, 6 hours
28 2.669.472,00 2.520.000,00 5.189.472,00 1 month, 22 days, 12 hours
40 2.669.344,00 3.600.000,00 6.269.344,00 2 months, 15 days
66 2.669.216,00 5.940.000,00 8.609.216,00 4 months, 3 days, 18 hours
200 2.669.088,00 18.000.000,00 20.669.088,00 1 year, 15 days


Database: Retribution 1.2.2 (534348)

User: Register | Login