Menu

True Sansha Large Beam Laser Battery Blueprint


Locations

Inventory: Blueprint > Structures - Laser Battery Blueprints


Image
True Sansha Large Beam Laser Battery Blueprint


Attributes

General Information
Produces
1 x True Sansha Large Beam Laser Battery
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
3 hours
Manufacturing Time (With Industry Skill Bonus)
Level 1: 2 hours, 52 minutes, 48 seconds
Level 2: 2 hours, 45 minutes, 36 seconds
Level 3: 2 hours, 38 minutes, 24 seconds
Level 4: 2 hours, 31 minutes, 12 seconds
Level 5: 2 hours, 24 minutes
Waste Factor
0.10
Researching
Research Material Time
2 days, 12 hours
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 2 days, 9 hours
Level 2: 2 days, 6 hours
Level 3: 2 days, 3 hours
Level 4: 2 days
Level 5: 1 day, 21 hours
Research Productivity Time
2 days, 12 hours
Research Productivity Time (With Research Skill Bonus)
Level 1: 2 days, 9 hours
Level 2: 2 days, 6 hours
Level 3: 2 days, 3 hours
Level 4: 2 days
Level 5: 1 day, 21 hours
Max. Production Runs On Copies
3
Research Copy Time - Max Copies
5 days
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 4 days, 18 hours
Level 2: 4 days, 12 hours
Level 3: 4 days, 6 hours
Level 4: 4 days
Level 5: 3 days, 18 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 1 day, 14 hours
Level 2: 1 day, 12 hours
Level 3: 1 day, 10 hours
Level 4: 1 day, 8 hours
Level 5: 1 day, 6 hours
Invention
Invention Time
1 day, 21 hours
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
2160
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 1
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Megacyte 10 11 12 12 13 13 14
Large Beam Laser Battery 1 1 1 1 1 1 1
Megacyte 122 134 140 146 153 159 165
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
24
= 2 months
'Optimal' Material Level
0
= 0 seconds
Production Efficiency
Perfect Productivity Level
4.320
= 30 years
= Manufacturing time (PL 5): 2 hours, 30 minutes
= Manufacturing time (PL 10): 2 hours, 27 minutes, 16 seconds
= Manufacturing time (PL 20): 2 hours, 25 minutes, 43 seconds
= Manufacturing time (perfect PL): 2 hours, 24 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 3 Item Cost Time For Research
0 13.687.840,00 0,00 13.687.840,00 0 seconds
1 13.638.688,00 120.000,00 13.758.688,00 2 days, 12 hours
2 13.614.112,00 240.000,00 13.854.112,00 5 days
3 13.605.920,00 360.000,00 13.965.920,00 7 days, 12 hours
4 13.597.728,00 480.000,00 14.077.728,00 10 days
8 13.589.536,00 960.000,00 14.549.536,00 20 days
24 13.581.344,00 2.880.000,00 16.461.344,00 2 months


Database: Inferno 1.1.5 (392804)

User: Register | Login