Menu

Sansha Medium Beam Laser Battery Blueprint


Locations

Inventory: Blueprint > Structures - Laser Battery Blueprints


Image
Sansha Medium Beam Laser Battery Blueprint


Attributes

General Information
Produces
1 x Sansha Medium Beam Laser Battery
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
2 hours, 15 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 2 hours, 9 minutes, 36 seconds
Level 2: 2 hours, 4 minutes, 12 seconds
Level 3: 1 hour, 58 minutes, 48 seconds
Level 4: 1 hour, 53 minutes, 24 seconds
Level 5: 1 hour, 48 minutes
Waste Factor
0.10
Researching
Research Material Time
1 day, 21 hours
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 1 day, 18 hours, 45 minutes
Level 2: 1 day, 16 hours, 30 minutes
Level 3: 1 day, 14 hours, 15 minutes
Level 4: 1 day, 12 hours
Level 5: 1 day, 9 hours, 45 minutes
Research Productivity Time
1 day, 21 hours
Research Productivity Time (With Research Skill Bonus)
Level 1: 1 day, 18 hours, 45 minutes
Level 2: 1 day, 16 hours, 30 minutes
Level 3: 1 day, 14 hours, 15 minutes
Level 4: 1 day, 12 hours
Level 5: 1 day, 9 hours, 45 minutes
Max. Production Runs On Copies
3
Research Copy Time - Max Copies
3 days, 18 hours
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 3 days, 13 hours, 30 minutes
Level 2: 3 days, 9 hours
Level 3: 3 days, 4 hours, 30 minutes
Level 4: 3 days
Level 5: 2 days, 19 hours, 30 minutes
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 1 day, 4 hours, 30 minutes
Level 2: 1 day, 3 hours
Level 3: 1 day, 1 hour, 30 minutes
Level 4: 1 day
Level 5: 22 hours, 30 minutes
Invention
Invention Time
1 day, 9 hours, 45 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
1620
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 1
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Megacyte 10 11 12 12 13 13 14
Medium Beam Laser Battery 1 1 1 1 1 1 1
Isogen 1 1 1 1 1 1 1
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
2
= 3 days, 18 hours
'Optimal' Material Level
0
= 0 seconds
Production Efficiency
Perfect Productivity Level
3.240
= 16 years, 10 months, 15 days
= Manufacturing time (PL 5): 1 hour, 52 minutes, 30 seconds
= Manufacturing time (PL 10): 1 hour, 50 minutes, 27 seconds
= Manufacturing time (PL 20): 1 hour, 49 minutes, 17 seconds
= Manufacturing time (perfect PL): 1 hour, 48 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 3 Item Cost Time For Research
0 2.590.240,00 0,00 2.590.240,00 0 seconds
2 2.582.048,00 180.000,00 2.762.048,00 3 days, 18 hours


Database: Retribution 1.2.2 (534348)

User: Register | Login