Menu

Incognito Tuner Data Interface Blueprint


Locations

Inventory: Blueprint > Tool Blueprint


Image
Incognito Tuner Data Interface Blueprint


Attributes

General Information
Produces
1 x Incognito Tuner Data Interface
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
20 hours
Manufacturing Time (With Industry Skill Bonus)
Level 1: 19 hours, 12 minutes
Level 2: 18 hours, 24 minutes
Level 3: 17 hours, 36 minutes
Level 4: 16 hours, 48 minutes
Level 5: 16 hours
Waste Factor
0.10
Researching
Research Material Time
10 hours
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 9 hours, 30 minutes
Level 2: 9 hours
Level 3: 8 hours, 30 minutes
Level 4: 8 hours
Level 5: 7 hours, 30 minutes
Research Productivity Time
10 hours
Research Productivity Time (With Research Skill Bonus)
Level 1: 9 hours, 30 minutes
Level 2: 9 hours
Level 3: 8 hours, 30 minutes
Level 4: 8 hours
Level 5: 7 hours, 30 minutes
Max. Production Runs On Copies
10
Research Copy Time - Max Copies
2 days, 5 hours, 20 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 2 days, 2 hours, 40 minutes
Level 2: 2 days
Level 3: 1 day, 21 hours, 20 minutes
Level 4: 1 day, 18 hours, 40 minutes
Level 5: 1 day, 16 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 5 hours, 4 minutes
Level 2: 4 hours, 48 minutes
Level 3: 4 hours, 32 minutes
Level 4: 4 hours, 16 minutes
Level 5: 4 hours
Invention
Invention Time
1 day, 2 hours, 40 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
14400
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 1
Gallente Encryption Methods 1
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Current Amplifier 32 35 37 38 40 42 43
Heat Depressor 10 11 12 12 13 13 14
Internal Bulkhead 4 4 5 5 5 5 5
Mainframe Bit 2 2 2 2 3 3 3
Second-hand Parts 20 22 23 24 25 26 27
Time Efficiency Research
Skills
Gallente Encryption Methods 3
Material Research
Skills
Gallente Encryption Methods 2
Copying
Skills
Gallente Encryption Methods 3
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
6
= 2 days, 12 hours
'Optimal' Material Level
0
= 0 seconds
Production Efficiency
Perfect Productivity Level
28.800
= 33 years, 4 months
= Manufacturing time (PL 5): 16 hours, 40 minutes
= Manufacturing time (PL 10): 16 hours, 21 minutes, 49 seconds
= Manufacturing time (PL 20): 16 hours, 11 minutes, 26 seconds
= Manufacturing time (perfect PL): 16 hours




Material Efficiency Levels

Level Material Cost Research Cost / 10 Item Cost Time For Research


Other Attributes

Structure
Attribute Name Display Name Value
hp Structure Hitpoints 1 HP
Raw


Database: Inferno 1.1.5 (392804)

User: Register | Login