Menu

Cryptic Tuner Data Interface Blueprint


Locations

Inventory: Blueprint > Tool Blueprint


Image
Cryptic Tuner Data Interface Blueprint


Attributes

General Information
Produces
1 x Cryptic Tuner Data Interface
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
20 hours
Manufacturing Time (With Industry Skill Bonus)
Level 1: 19 hours, 12 minutes
Level 2: 18 hours, 24 minutes
Level 3: 17 hours, 36 minutes
Level 4: 16 hours, 48 minutes
Level 5: 16 hours
Waste Factor
0.10
Researching
Research Material Time
10 hours
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 9 hours, 30 minutes
Level 2: 9 hours
Level 3: 8 hours, 30 minutes
Level 4: 8 hours
Level 5: 7 hours, 30 minutes
Research Productivity Time
10 hours
Research Productivity Time (With Research Skill Bonus)
Level 1: 9 hours, 30 minutes
Level 2: 9 hours
Level 3: 8 hours, 30 minutes
Level 4: 8 hours
Level 5: 7 hours, 30 minutes
Max. Production Runs On Copies
10
Research Copy Time - Max Copies
2 days, 5 hours, 20 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 2 days, 2 hours, 40 minutes
Level 2: 2 days
Level 3: 1 day, 21 hours, 20 minutes
Level 4: 1 day, 18 hours, 40 minutes
Level 5: 1 day, 16 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 5 hours, 4 minutes
Level 2: 4 hours, 48 minutes
Level 3: 4 hours, 32 minutes
Level 4: 4 hours, 16 minutes
Level 5: 4 hours
Invention
Invention Time
1 day, 2 hours, 40 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
14400
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 1
Minmatar Encryption Methods 1
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Construction Alloy 4 4 5 5 5 5 5
Data Processor 2 2 2 2 3 3 3
Electric Conduit 32 35 37 38 40 42 43
Energy Cells 10 11 12 12 13 13 14
Mechanic Parts 20 22 23 24 25 26 27
Time Efficiency Research
Skills
Minmatar Encryption Methods 3
Material Research
Skills
Minmatar Encryption Methods 2
Copying
Skills
Minmatar Encryption Methods 3
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
6
= 2 days, 12 hours
'Optimal' Material Level
0
= 0 seconds
Production Efficiency
Perfect Productivity Level
28.800
= 33 years, 4 months
= Manufacturing time (PL 5): 16 hours, 40 minutes
= Manufacturing time (PL 10): 16 hours, 21 minutes, 49 seconds
= Manufacturing time (PL 20): 16 hours, 11 minutes, 26 seconds
= Manufacturing time (perfect PL): 16 hours




Material Efficiency Levels

Level Material Cost Research Cost / 10 Item Cost Time For Research


Other Attributes

Structure
Attribute Name Display Name Value
hp Structure Hitpoints 1 HP
Raw


Database: Inferno 1.1.5 (392804)

User: Register | Login