Menu

Large Memetic Algorithm Bank II Blueprint

Baseprice: 1,250,000 ISK

Locations

Inventory: Blueprint > Rig Blueprint


Image
Large Memetic Algorithm Bank II Blueprint


Attributes

General Information
Produces
1 x Large Memetic Algorithm Bank II
Tech Level
2
Volume
0.0100 m3
Manufacturing
Manufacturing Time
8 hours, 20 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 8 hours
Level 2: 7 hours, 40 minutes
Level 3: 7 hours, 20 minutes
Level 4: 7 hours
Level 5: 6 hours, 40 minutes
Waste Factor
0.10
Researching
Research Material Time
6 days, 22 hours, 40 minutes
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 6 days, 14 hours, 20 minutes
Level 2: 6 days, 6 hours
Level 3: 5 days, 21 hours, 40 minutes
Level 4: 5 days, 13 hours, 20 minutes
Level 5: 5 days, 5 hours
Research Productivity Time
6 days, 22 hours, 40 minutes
Research Productivity Time (With Research Skill Bonus)
Level 1: 6 days, 14 hours, 20 minutes
Level 2: 6 days, 6 hours
Level 3: 5 days, 21 hours, 40 minutes
Level 4: 5 days, 13 hours, 20 minutes
Level 5: 5 days, 5 hours
Max. Production Runs On Copies
10
Research Copy Time - Max Copies
13 days, 21 hours, 20 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 13 days, 4 hours, 40 minutes
Level 2: 12 days, 12 hours
Level 3: 11 days, 19 hours, 20 minutes
Level 4: 11 days, 2 hours, 40 minutes
Level 5: 10 days, 10 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 1 day, 7 hours, 40 minutes
Level 2: 1 day, 6 hours
Level 3: 1 day, 4 hours, 20 minutes
Level 4: 1 day, 2 hours, 40 minutes
Level 5: 1 day, 1 hour
Invention
Invention Time
5 days, 5 hours
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
6000
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0.4
 

Bill Of Materials

Manufacturing
Skills
Industry 5
Jury Rigging 1
Electromagnetic Physics 1
Electronic Engineering 1
Materials - Partially Consumed Usage
R.A.M.- Electronics 10%
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Artificial Neural Network 16 18 18 19 20 21 22
Conductive Thermoplastic 8 9 9 10 10 10 11
Power Circuit 20 22 23 24 25 26 27
Time Efficiency Research
Skills
Jury Rigging 1
Research 1
Material Research
Skills
Jury Rigging 1
Metallurgy 1
Copying
Materials - Consumed Amount
Data Sheets 10
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
4
= 27 days, 18 hours, 40 minutes
'Optimal' Material Level
0
= 0 seconds
Production Efficiency
Perfect Productivity Level
12.000
= 231 years, 5 months, 23 days, 8 hours
= Manufacturing time (PL 5): 6 hours, 56 minutes, 40 seconds
= Manufacturing time (PL 10): 6 hours, 49 minutes, 5 seconds
= Manufacturing time (PL 20): 6 hours, 44 minutes, 46 seconds
= Manufacturing time (perfect PL): 6 hours, 40 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 10 Item Cost Time For Research


Database: Inferno 1.1.5 (392804)

User: Register | Login