Menu

Occult Ship Data Interface Blueprint


Locations

Inventory: Blueprint > Tool Blueprint


Manufacturing
Manufacturing Time
20 hours
Skilled Time (Industry 5 + Adv. Indu. 5)
13 hours, 36 minutes
Produces
Occult Ship Data Interface

 
Requirements
Materials ME 0% ME-1% ME-2% ME-3% ME-4% ME-5% ME-6% ME-7% ME-8% ME-9% ME-10%
Analog Panel 11 11 11 11 11 11 11 11 11 11 10
Auxiliary Parts 111 110 109 108 107 106 105 104 103 102 100
Elemental Crux 22 22 22 22 22 21 21 21 21 21 20
Force Cable 56 56 55 55 54 54 53 53 52 51 51
Positron Cord 178 177 175 173 171 170 168 166 164 162 161
Skills
Amarr Encryption Methods 1
Industry 1

Material Efficiency
Research Time
52 minutes, 30 seconds
Skilled Time (Metallurgy 5 + Adv. Indu. 5)
33 minutes, 28 seconds

 
Research Requirements
Skills
Amarr Encryption Methods 2

 
ME & TE Research Times
Level 1
33 minutes, 28 seconds
Level 2
1 hour, 19 minutes, 41 seconds
Level 3
3 hours, 9 minutes, 39 seconds
Level 4
7 hours, 30 minutes, 43 seconds
Level 5
17 hours, 51 minutes
Level 6
1 day, 18 hours, 30 minutes
Level 7
4 days, 4 hours, 56 minutes, 15 seconds
Level 8
10 days, 25 minutes, 2 seconds
Level 9
23 days, 20 hours, 9 minutes, 23 seconds
Level 10
1 month, 26 days, 16 hours

Time Efficiency
Research Time
52 minutes, 30 seconds
Skilled Time (Research 5 + Adv. Indu. 5)
33 minutes, 28 seconds

 
Research Requirements
Skills
Amarr Encryption Methods 3

 
Copy
Copying Time (per single-run copy)
16 hours
Skilled Time (Science 5 + Adv. Indu. 5)
10 hours, 12 minutes
Max. Runs Per Copy
8

 
Copying Requirements
Skills
Amarr Encryption Methods 3

 


Database: YC119.1 (2017-01-14)

User: Register | Login