Menu

'Saddle' Small Capacitor Booster I Blueprint


Locations

Inventory: Blueprint > Capacitor Booster Blueprint


Image


Attributes

General Information
Produces
1 x 'Saddle' Small Capacitor Booster I
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
25 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 24 minutes
Level 2: 23 minutes
Level 3: 22 minutes
Level 4: 21 minutes
Level 5: 20 minutes
Waste Factor
0.10
Researching
Research Material Time
3 hours, 20 minutes
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Research Productivity Time
3 hours, 20 minutes
Research Productivity Time (With Research Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Max. Production Runs On Copies
1.000
Research Copy Time - Max Copies
6 hours, 40 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 6 hours, 20 minutes
Level 2: 6 hours
Level 3: 5 hours, 40 minutes
Level 4: 5 hours, 20 minutes
Level 5: 5 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 22 seconds
Level 2: 21 seconds
Level 3: 20 seconds
Level 4: 19 seconds
Level 5: 18 seconds
Invention
Invention Time
1 day, 9 hours, 20 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
120
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 5
Takmahl Technology 2
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Takmahl Dynamic Gauge 2 2 2 2 3 3 3
Takmahl Fractal Sheet 2 2 2 2 3 3 3
Megacyte 1 1 1 1 1 1 1
Nocxium 5 6 6 6 6 7 7
Tritanium 249 274 286 299 311 324 336
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
49
= 6 days, 19 hours, 20 minutes
'Optimal' Material Level
1
= 3 hours, 20 minutes
Production Efficiency
Perfect Productivity Level
240
= 1 month, 3 days, 8 hours
= Manufacturing time (PL 5): 23 minutes, 20 seconds
= Manufacturing time (PL 10): 23 minutes, 11 seconds
= Manufacturing time (PL 20): 23 minutes, 6 seconds
= Manufacturing time (perfect PL): 23 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 1000 Item Cost Time For Research
0 11.812,00 0,00 11.812,00 0 seconds
1 11.274,00 20,00 11.294,00 3 hours, 20 minutes
2 11.266,00 40,00 11.306,00 6 hours, 40 minutes
3 11.262,00 60,00 11.322,00 10 hours
4 11.260,00 80,00 11.340,00 13 hours, 20 minutes
5 11.258,00 100,00 11.358,00 16 hours, 40 minutes
7 11.256,00 140,00 11.396,00 23 hours, 20 minutes
9 11.254,00 180,00 11.434,00 1 day, 6 hours
16 11.252,00 320,00 11.572,00 2 days, 5 hours, 20 minutes
49 11.250,00 980,00 12.230,00 6 days, 19 hours, 20 minutes


Database: Retribution 1.2.2 (534348)

User: Register | Login