Menu

'Radical' Damage Control I Blueprint


Locations

Inventory: Blueprint > Damage Control Blueprint


Attributes

General Information
Produces
1 x 'Radical' Damage Control I
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
50 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 48 minutes
Level 2: 46 minutes
Level 3: 44 minutes
Level 4: 42 minutes
Level 5: 40 minutes
Waste Factor
0.10
Researching
Research Material Time
3 hours, 20 minutes
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Research Productivity Time
3 hours, 20 minutes
Research Productivity Time (With Research Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Max. Production Runs On Copies
1.000
Research Copy Time - Max Copies
6 hours, 40 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 6 hours, 20 minutes
Level 2: 6 hours
Level 3: 5 hours, 40 minutes
Level 4: 5 hours, 20 minutes
Level 5: 5 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 22 seconds
Level 2: 21 seconds
Level 3: 20 seconds
Level 4: 19 seconds
Level 5: 18 seconds
Invention
Invention Time
1 day, 9 hours, 20 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
120
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 5
Yan Jung Technology 3
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Yan Jung Crystal Cylinder 2 2 2 2 3 3 3
Yan Jung Paradox Box 2 2 2 2 3 3 3
Yan Jung Glass Scale 1 1 1 1 1 1 1
Yan Jung Null Shell 2 2 2 2 3 3 3
Yan Jung Info Matrix 1 1 1 1 1 1 1
Yan Jung Vellum Etch 1 1 1 1 1 1 1
Mexallon 48 53 55 58 60 62 65
Nocxium 3 3 3 4 4 4 4
Pyerite 2 2 2 2 3 3 3
Tritanium 956 1.052 1.099 1.147 1.195 1.243 1.291
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
191
= 26 days, 12 hours, 40 minutes
'Optimal' Material Level
3
= 10 hours
Production Efficiency
Perfect Productivity Level
240
= 1 month, 3 days, 8 hours
= Manufacturing time (PL 5): 48 minutes, 20 seconds
= Manufacturing time (PL 10): 48 minutes, 11 seconds
= Manufacturing time (PL 20): 48 minutes, 6 seconds
= Manufacturing time (perfect PL): 48 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 1000 Item Cost Time For Research
0 5.352,00 0,00 5.352,00 0 seconds
1 5.160,00 20,00 5.180,00 3 hours, 20 minutes
2 5.128,00 40,00 5.168,00 6 hours, 40 minutes
3 5.080,00 60,00 5.140,00 10 hours
4 5.070,00 80,00 5.150,00 13 hours, 20 minutes
5 5.064,00 100,00 5.164,00 16 hours, 40 minutes
6 5.060,00 120,00 5.180,00 20 hours
7 5.056,00 140,00 5.196,00 23 hours, 20 minutes
8 5.054,00 160,00 5.214,00 1 day, 2 hours, 40 minutes
9 5.020,00 180,00 5.200,00 1 day, 6 hours
10 5.018,00 200,00 5.218,00 1 day, 9 hours, 20 minutes
11 5.016,00 220,00 5.236,00 1 day, 12 hours, 40 minutes
12 5.014,00 240,00 5.254,00 1 day, 16 hours
14 5.012,00 280,00 5.292,00 1 day, 22 hours, 40 minutes
17 5.010,00 340,00 5.350,00 2 days, 8 hours, 40 minutes
21 5.008,00 420,00 5.428,00 2 days, 22 hours
27 5.006,00 540,00 5.546,00 3 days, 18 hours
38 5.004,00 760,00 5.764,00 5 days, 6 hours, 40 minutes
63 5.002,00 1.260,00 6.262,00 8 days, 18 hours
191 5.000,00 3.820,00 8.820,00 26 days, 12 hours, 40 minutes


Database: Odyssey 1.0.2 (550422)

User: Register | Login