Menu

1MN Analog Booster Rockets Blueprint


Locations

Inventory: Blueprint > Propulsion Module Blueprint


Image
1MN Analog Booster Rockets Blueprint


Attributes

General Information
Produces
1 x 1MN Analog Booster Rockets
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
20 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 19 minutes, 12 seconds
Level 2: 18 minutes, 24 seconds
Level 3: 17 minutes, 36 seconds
Level 4: 16 minutes, 48 seconds
Level 5: 16 minutes
Waste Factor
0.10
Researching
Research Material Time
3 hours, 20 minutes
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Research Productivity Time
3 hours, 20 minutes
Research Productivity Time (With Research Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Max. Production Runs On Copies
1.000
Research Copy Time - Max Copies
6 hours, 40 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 6 hours, 20 minutes
Level 2: 6 hours
Level 3: 5 hours, 40 minutes
Level 4: 5 hours, 20 minutes
Level 5: 5 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 22 seconds
Level 2: 21 seconds
Level 3: 20 seconds
Level 4: 19 seconds
Level 5: 18 seconds
Invention
Invention Time
1 day, 9 hours, 20 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
120
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 5
Sleeper Technology 2
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Sleeper Heat Nullifying Coil 1 1 1 1 1 1 1
Sleeper Foundation Block 1 1 1 1 1 1 1
Sleeper Micro Circuits 1 1 1 1 1 1 1
Mexallon 1 1 1 1 1 1 1
Nocxium 1 1 1 1 1 1 1
Pyerite 579 637 666 695 724 753 782
Tritanium 637 701 733 764 796 828 860
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
127
= 17 days, 15 hours, 20 minutes
'Optimal' Material Level
4
= 13 hours, 20 minutes
Production Efficiency
Perfect Productivity Level
240
= 1 month, 3 days, 8 hours
= Manufacturing time (PL 5): 18 minutes, 20 seconds
= Manufacturing time (PL 10): 18 minutes, 11 seconds
= Manufacturing time (PL 20): 18 minutes, 6 seconds
= Manufacturing time (perfect PL): 18 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 1000 Item Cost Time For Research
0 7.042,00 0,00 7.042,00 0 seconds
1 6.746,00 20,00 6.766,00 3 hours, 20 minutes
2 6.644,00 40,00 6.684,00 6 hours, 40 minutes
3 6.594,00 60,00 6.654,00 10 hours
4 6.572,00 80,00 6.652,00 13 hours, 20 minutes
5 6.552,00 100,00 6.652,00 16 hours, 40 minutes
6 6.532,00 120,00 6.652,00 20 hours
7 6.522,00 140,00 6.662,00 23 hours, 20 minutes
8 6.512,00 160,00 6.672,00 1 day, 2 hours, 40 minutes
9 6.510,00 180,00 6.690,00 1 day, 6 hours
10 6.502,00 200,00 6.702,00 1 day, 9 hours, 20 minutes
11 6.500,00 220,00 6.720,00 1 day, 12 hours, 40 minutes
12 6.492,00 240,00 6.732,00 1 day, 16 hours
14 6.490,00 280,00 6.770,00 1 day, 22 hours, 40 minutes
16 6.482,00 320,00 6.802,00 2 days, 5 hours, 20 minutes
18 6.480,00 360,00 6.840,00 2 days, 12 hours
23 6.472,00 460,00 6.932,00 3 days, 4 hours, 40 minutes
25 6.470,00 500,00 6.970,00 3 days, 11 hours, 20 minutes
38 6.462,00 760,00 7.222,00 5 days, 6 hours, 40 minutes
42 6.460,00 840,00 7.300,00 5 days, 20 hours
115 6.452,00 2.300,00 8.752,00 15 days, 23 hours, 20 minutes
127 6.450,00 2.540,00 8.990,00 17 days, 15 hours, 20 minutes


Database: Inferno 1.1.5 (392804)

User: Register | Login