Menu

Federation Navy Tracking Computer Blueprint


Locations

Inventory: Blueprint > Tracking Computer Blueprint


Image
Federation Navy Tracking Computer Blueprint


Attributes

General Information
Produces
1 x Federation Navy Tracking Computer
Tech Level
0
Volume
0.0100 m3
Manufacturing
Manufacturing Time
10 minutes
Manufacturing Time (With Industry Skill Bonus)
Level 1: 9 minutes, 36 seconds
Level 2: 9 minutes, 12 seconds
Level 3: 8 minutes, 48 seconds
Level 4: 8 minutes, 24 seconds
Level 5: 8 minutes
Waste Factor
0.10
Researching
Research Material Time
3 hours, 20 minutes
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Research Productivity Time
3 hours, 20 minutes
Research Productivity Time (With Research Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
Max. Production Runs On Copies
1.000
Research Copy Time - Max Copies
6 hours, 40 minutes
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 6 hours, 20 minutes
Level 2: 6 hours
Level 3: 5 hours, 40 minutes
Level 4: 5 hours, 20 minutes
Level 5: 5 hours
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 22 seconds
Level 2: 21 seconds
Level 3: 20 seconds
Level 4: 19 seconds
Level 5: 18 seconds
Invention
Invention Time
1 day, 9 hours, 20 minutes
Can Invent
Nothing
Uncategorized Database Fields
productivityModifier
120
materialModifier
5
chanceOfReverseEngineering (Invention probability?)
0
 

Bill Of Materials

Manufacturing
Skills
Industry 1
Materials - Consumed Base PE5 PE4 PE3 PE2 PE1 PE0
Megacyte 1 1 1 1 1 1 1
Tritanium 854 939 982 1.025 1.068 1.110 1.153
Time Efficiency Research
No requirements
Material Research
No requirements
Copying
No requirements
Invention
No requirements
Reverse Engineering
No requirements


Research Levels

Material Efficiency
Perfect Material Level (0% waste)
170
= 23 days, 14 hours, 40 minutes
'Optimal' Material Level
2
= 6 hours, 40 minutes
Production Efficiency
Perfect Productivity Level
240
= 1 month, 3 days, 8 hours
= Manufacturing time (PL 5): 8 minutes, 20 seconds
= Manufacturing time (PL 10): 8 minutes, 11 seconds
= Manufacturing time (PL 20): 8 minutes, 6 seconds
= Manufacturing time (perfect PL): 8 minutes




Material Efficiency Levels

Level Material Cost Research Cost / 1000 Item Cost Time For Research
0 10.070,00 0,00 10.070,00 0 seconds
1 9.986,00 20,00 10.006,00 3 hours, 20 minutes
2 9.956,00 40,00 9.996,00 6 hours, 40 minutes
3 9.942,00 60,00 10.002,00 10 hours
4 9.934,00 80,00 10.014,00 13 hours, 20 minutes
5 9.928,00 100,00 10.028,00 16 hours, 40 minutes
6 9.924,00 120,00 10.044,00 20 hours
7 9.922,00 140,00 10.062,00 23 hours, 20 minutes
8 9.918,00 160,00 10.078,00 1 day, 2 hours, 40 minutes
10 9.916,00 200,00 10.116,00 1 day, 9 hours, 20 minutes
11 9.914,00 220,00 10.134,00 1 day, 12 hours, 40 minutes
13 9.912,00 260,00 10.172,00 1 day, 19 hours, 20 minutes
15 9.910,00 300,00 10.210,00 2 days, 2 hours
18 9.908,00 360,00 10.268,00 2 days, 12 hours
24 9.906,00 480,00 10.386,00 3 days, 8 hours
34 9.904,00 680,00 10.584,00 4 days, 17 hours, 20 minutes
56 9.902,00 1.120,00 11.022,00 7 days, 18 hours, 40 minutes
170 9.900,00 3.400,00 13.300,00 23 days, 14 hours, 40 minutes


Offered in LP Stores

Offered Cost
5x Gallente Navy Tracking Computer Blueprint
54,000 LP
21,600,000 Credits
270 Caldari Navy Captain Insignia I
336 Caldari Navy Captain Insignia II
404 Caldari Navy Captain Insignia III


Database: Retribution 1.2.2 (534348)

User: Register | Login