Attributes
Produces
1 x Imperial Navy Adaptive Nano Plating
|
Tech Level
0
|
Volume
0.0100 m3
|
Manufacturing Time
10 minutes
|
Manufacturing Time (With Industry Skill Bonus)
Level 1: 9 minutes, 36 seconds
Level 2: 9 minutes, 12 seconds
Level 3: 8 minutes, 48 seconds
Level 4: 8 minutes, 24 seconds
Level 5: 8 minutes
|
Waste Factor
0.10
|
Research Material Time
3 hours, 20 minutes
|
Research Material Time (With Metallurgy Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
|
Research Productivity Time
3 hours, 20 minutes
|
Research Productivity Time (With Research Skill Bonus)
Level 1: 3 hours, 10 minutes
Level 2: 3 hours
Level 3: 2 hours, 50 minutes
Level 4: 2 hours, 40 minutes
Level 5: 2 hours, 30 minutes
|
Max. Production Runs On Copies
1.000
|
Research Copy Time - Max Copies
6 hours, 40 minutes
|
Research Copy Time - Max Copies (With Science Skill Bonus)
Level 1: 6 hours, 20 minutes
Level 2: 6 hours
Level 3: 5 hours, 40 minutes
Level 4: 5 hours, 20 minutes
Level 5: 5 hours
|
Research Copy Time - Single Copy (With Science Skill Bonus)
Level 1: 22 seconds
Level 2: 21 seconds
Level 3: 20 seconds
Level 4: 19 seconds
Level 5: 18 seconds
|
Invention Time
1 day, 9 hours, 20 minutes
|
Can Invent
Nothing
|
productivityModifier
120
|
materialModifier
5
|
chanceOfReverseEngineering (Invention probability?)
0
|
|
|
Bill Of Materials
|
Industry 1
|
|
Mexallon
|
26
|
29
|
30
|
31
|
33
|
34
|
35
|
|
Pyerite
|
628
|
691
|
722
|
754
|
785
|
816
|
848
|
|
Tritanium
|
806
|
887
|
927
|
967
|
1.008
|
1.048
|
1.088
|
| No requirements |
| No requirements |
| No requirements |
| No requirements |
| No requirements |
Research Levels
Perfect Material Level (0% waste)
161
= 22 days, 8 hours, 40 minutes
|
'Optimal' Material Level
5
= 16 hours, 40 minutes
|
Perfect Productivity Level
240
= 1 month, 3 days, 8 hours
= Manufacturing time (PL 5): 8 minutes, 20 seconds
= Manufacturing time (PL 10): 8 minutes, 11 seconds
= Manufacturing time (PL 20): 8 minutes, 6 seconds
= Manufacturing time (perfect PL): 8 minutes
|
|